QC
One task of this unit is to adjust the product specifications according to various national and
international recognized standards such which consist of three stages as follow: input control
, control during procedure and final testing.
Input control in the base of sampling is done for all the input requirements and raw materials.
the control during procedure is done for all product procedures considering the obligations
of specifications both in sampling and continuously whereas in the final testing all the products
should be tested.
Laboratory
The product tests are according to IEC\ BS\ ASTM \ VDE Standards or any other standards
demanded by customers. To achieve our main objectives, we also prepared the first main
requirements to obtain the ISO / IEC 17025 License.
we hope having this license and increasing our technnical know ledge can help us to achieve
a high level of customer appreciation resulting in long – lasting relations as well as obtaining
an effective contribution of global market.
